2,000 Has.
Full Masterplan
Logistik I, Logistik II and future growth
10.7 Has.
Commercial area
1,050 Has.
Masterplan Logistik II and future growth.
637 Has.
For future growth
403 Has.
Industrial area
Speculative lots
Now operating
Not available lots
Under construction
Available lots
Reserved lots
Intermodal Container Terminal
Railway Kansas City Southern
Administrative offices
Green areas
Public Lighting
24 Hr. Security
Controlled Access
Power Energy
Medium & High Tension availability Redundancy power lines (dual supply feed) Internal power substation
Water
Logistik lays over one of the aquifers with greater
availability of water in SLP
The park’s system has an installed capacity of 0.25 L per second/Ha.
The park supply is 50 L per second.
Water Treatment Plant
Natural Gas
Fiber Optic